Production facilities

# Plants Year of commissioning Installed electric capacity, mw Installed thermal capacity, gcal/h
  Belgorod Generation   143.2 580.3
1 Belgorod TPP (thermal power plant) 1938 60.0 360.4
2 GT-TPP (gas turbine TPP) "Luch" 2005 60.0 62.4
3 Gubkin TPP 1954 23.2 157.5
  Voronezh Generation   505.3 1'966.0
4 TPP-1,
including PSU-223 MW
1933
2020
378.3
219.6
1'389.3
168.4
5 TPP-2,
including PSU-115 MW
1957
2010
127.0
115.0
785.0
70.0
  Kursk Generation   246.7 2'009.0
6 TPP-1 1955 125.0 710.0
7 Kursk TPP-4 1934 4.8 395.0
8 TPP Quadra 2011 116.9 710.0
  Lipetsk Generation   529.0 1'319.4
9 TPP-2 1978 515.0 1'002.0
10 Elets TPP 1955 5.0 148.0
11 Dankov TPP 1961 9.0 169.4
  Orel Generation   366.0 946.7
12 Orel TPP 1946 330.0 725.0
13 Livny TPP,
including PSU-30 MW
1958
2013
36.0
30.0
221.7
34.0
  Smolensk Generation   275.0 774.0
14 Smolensk TPP-2 1973 275.0 774.0
  Tambov Generation   235.0 947.0
15 Tambov TPP 1954 235.0 947.0
  "Central Generation"   575.8 1'198.1
  Kaluga Region   41.8 110.1
16 Kaluga TPP,
including PSU-30 MW
1948
2013
41.8
30.0
110.1
40.0
  Tula Region   300.2 667.0
17 Alexin TPP,
including PSU-115 MW
1941
2019
62.0
124.1
150.0
87.0
18 Efremov TPP 1931 160.0 520.0
  Ryazan Region   223.6 421.0
19 Dyagilev TPP,
including PSU-115 MW
1958
2016
224.7
119.2
421.0
23.0
  Total   2'876.0 9'948.8